Site 5 = Fairfield 49.9MW
(pre-application in progress)
Fifth site (Fairfield) Owner = LOCOGEN (Green Switch Capital)
Physical Size = ?unknown?
When Planning went in Due Q2 2025
Planning Approved = NOT YET
Whats Next = Planning Application
Time line for construction = to start 2029, to go online 2030
How long lease period = ??
Power Output = 49.9MW, Capacity = 100MWh release over 2 hour period
Aberdeenshire Planning Application Number - ENQ/2024/1599
​
This site is very close to Meikle Wartle SSSI (Site of Special Scientific Interest)
https://sitelink.nature.scot/site/1596
There are major concerns about the effect of airborne contaminants from a fire on this area.
​